The public bid opening meeting of School District No. 26, Lockwood Schools, Yellowstone County, was held in the Board Room, 1932 U.S. Highway 87, Billings, Montana on Friday, September 14, 2007, at 12:00 noon.
Trustees and officers present were Trustees: Jason Hamrick, Tim Sather, and Susanne Vinton, and Superintendent Eileen Johnson and District Clerk Diane Brook.
Registered guest present was Scott Chartier High Tech Construction.
Art Anderson, Mike Sullivan and Mike Bowman were also present.
Bids for Phase III - Bid Pack 3 (Middle School Building)
Scott Chartier of High Tech Construction, Construction Manager for the project, advised that several contractors had bid directly to High Tech Construction.
Mr. Chartier read aloud the sealed bids, with each bidder acknowledging Addenda 1-4 (when applicable), as follows:
| 2.0 Site Work 3.0 Concrete 4.0 Masonry 4.1 Unit Masonry Siding Siding – Option C 4.2 Mortarless Siding - Option D 6.0 Bldg. Framing Interior/Struct. 7.0 Metal Wall Siding Option A 7.1 Fiber Cement Siding Option B |
No Bid High Tech High Tech High Tech High Tech High Tech No Bid High Tech |
$ 295,159 $ 312,700 $ 194,300 $ 126,500 $2,497,400 $ 167,400 |
Page 2
September 14, 2007
Bid Opening Meeting
| 7.2 Thermal Insulation 7.3 Roofing Metal Trim Drainage 8.0 Aluminum Doors & Windows 9.0 Painting 9.1 Acoustical Ceilings 9.2 Flooring 11.0 Foodservice Equipment 11.1 Gymnasium Equipment 14.0 Hydraulic Elevator |
High Tech High Tech High Tech High Tech High Tech Matco High Tech High Tech No Bid High Tech |
$ 40,778 $ 320,200 $ 158,700 $ 168,200 $ 100,800 $ 121,777 $ 275,000 $ 110,022 $ 51,019 |
| 15.0 Mechanical Complete |
Wagners Star Service Williams Williams Williams Tot. |
$2,019,000 $1,984,700 $1,800,000 + 172,975 (faxed addition) $1,972,975 |
| 16.0 Electrical Complete |
Treasure State Colstrip Elec. High Tech |
$ 752,590 $ 984,900 $ 727,750 |
| Cabinetry | Casework | $ 223,311 materials $ 57,500 installation $ 280,811 total |
Page 3
September 14, 2007
Bid Opening Meeting
Scott informed those present that the bids would be taken under advisement. All bids will need to be reviewed to make sure they are complete; they will also make sure that there is no over-lapping work between bids, so there is no duplication of costs among the bids.
A special board meeting is scheduled for Wednesday, September 26, 2007, at which the final decision will be made. At that meeting Scott Chartier, representing High Tech Construction, will make bid award recommendations to the Board or Trustees from the bids received today, and they will provide the Guaranteed Maximum Price (GMP).
The bid opening was concluded at 12:30 p.m.